中文版 >>Welcome to Jingzhou Municipal People's Government website !
Maiden operation of Jingzhou coal rail-water combined transport, storage and distribution base (phase I) succeeds
Updated: 2020-12-15 10:00:59

The first train between Shaanxi Coal and Chemical Industry Group and Jingzhou Coal Port arrived in Jiangling and completed unloading at Jingzhou Coal Rail-Water Transport, Storage and Distribution Base on December 14, marking the heavy-haul commissioning of the base has been wrapped up and the base has met operation conditions.

A 47-carriage C70E heavy-haul train loaded with 3,290 tons of coal arrived in Jiangling via Haolebaoji-Ji'an Railway on December 14. At 9:58 am, a diesel locomotive involved in Phase I of the base dragged the train to the tippler house from Jiangling Station of Haolebaoji-Ji'an Railway. The train crossed the tippler system, unloaded coal from the tippler, and transported coal to yard 9 through an activated feeder, 7 conveyance belts and stacker/reclaimer 5, to complete coal tippling and stacking.

The tippler house involved in Phase I of the base, next to Haolebaoji-Ji'an Railway, broke ground on January 19, 2019. With a tippling capacity of 8,000 tons per hour, the construction project involves the main works, foundation supporting works, drainage works and earthworks.

The base will develop into the largest coal transfer and trading platform in Central China, as well as an emergency coal storage and supply support platform in Hubei. With the functions of logistics distribution, emergency storage, coal blending and coal trading, the base will leverage its advantage of rail-water combined transport and improve its coal transport system to provide strong energy support for the development of the Yangtze River Economic Belt. 


Copyright Jingzhou Municipal People's Government All rights reserved.
Presented by Jingzhou Municipal Bureau of Foreign and Overseas Chinese Affairs.
Tel 0716-8421466 The ICP: 05028271 -1